Choose hazards, staffing, and regulations to set smart drill timing for teams. See yearly targets, interval days, and preparedness score, instantly after each update.
Sample inputs and typical outputs for quick validation.
| Scenario | Workers | Risk | Incidents | Response (min) | Minimum/year | Recommended/year | Interval (days) |
|---|---|---|---|---|---|---|---|
| Low-risk fitout | 25 | Low | 0 | 8 | 2 | 4 | 91 |
| Busy structural build | 120 | High | 1 | 12 | 4 | 10 | 37 |
| Complex high-hazard phase | 220 | Extreme | 2 | 18 | 6 | 14 | 26 |
This calculator converts site conditions into a risk score, then maps that score to a recommended drills-per-year value.
Adjust the regulatory minimum to match your jurisdiction or client requirements.
Construction sites change weekly: crews rotate, access routes shift, and temporary services move. A fixed annual plan can drift from reality. Use a cadence tied to current exposure so alarms, muster, first-aid response, and incident control remain familiar during active phases.
This calculator combines workforce, contractors, shifts, and overall risk with modifiers for public interface, response time, incident history, and training maturity. High-risk activities add weighted points (for example, confined space and chemicals carry higher weights than traffic control) to reflect rescue complexity.
Risk scoring maps to a recommended drills-per-year target using 2 + (risk_score ÷ 10), then enforces your regulatory minimum. Results are bounded from 2 to 24 drills per year, supporting planning from quarterly refreshers to frequent practice during high-hazard periods.
Intervals are computed as 365 ÷ drills_per_year and rounded into practical days. The tool also estimates drills during the project by scaling to duration months. For a six‑month package, a 10‑per‑year plan becomes approximately five drills, keeping the cycle proportional.
Select the emergency types your site must practice, and the annual total is distributed across the chosen scenarios. A balanced mix prevents “single-scenario bias” and keeps supervisors prepared for fire response, evacuation, medical incidents, spills, weather shelter, and specialized rescues as applicable.
Beyond frequency, track outcome measures: time-to-alarm acknowledgement, time-to-muster, headcount reconciliation accuracy, radio clarity, equipment readiness, and role execution. Recording these metrics each drill builds trend data and supports targeted coaching rather than repeating generic briefings.
Recalculate after step-changes: workforce increases, new subcontractors mobilize, shift patterns expand, response time worsens, or an incident occurs. Also increase during complex lifts, confined space campaigns, major demolition, or when public interface increases due to adjacent traffic or occupied facilities.
Use the CSV and PDF exports to demonstrate a defensible basis for your plan. Pair frequency with drill records: scenario, date, attendance, observed gaps, corrective actions, and closure dates. Auditors look for repeatable planning logic and evidence that lessons were implemented.
Use the strictest requirement that applies: law, client standard, or site policy. If unsure, start with a conservative minimum and refine after consulting your safety plan and contract obligations.
Base it on overall hazard exposure and complexity. Low fits routine, well-controlled work. High suits structural, heavy plant, or multiple high-risk trades. Extreme suits dense high-hazard phases, complex interfaces, or limited access/egress.
More shifts increase repetition needs because different people may miss the same briefing. Enter the true number of operating shifts so cadence reflects real coverage, especially for night work and weekend rotations.
If you want a more cautious drill plan, yes. Near-misses often signal control gaps. Using them increases the incident score and typically raises the recommended frequency until performance stabilizes.
It is the realistic time from alarm to effective response—either internal response readiness or external arrival. Slower response increases the need for rapid self-organization, clear roles, and frequent practice.
You can, but coverage narrows. Selecting multiple types distributes the annual total into a healthier mix. This supports broad readiness while keeping the overall frequency consistent with your risk and minimum requirements.
At least monthly, and immediately after major changes: new crews, new hazards, incident trends, access changes, or scope shifts. Frequent recalculation keeps the plan aligned with current site reality.
Run drills regularly, document results, and improve site readiness.
Important Note: All the Calculators listed in this site are for educational purpose only and we do not guarentee the accuracy of results. Please do consult with other sources as well.