Area unit
m²
ft²
Keep your costs per same unit.
Structure type
Residential (×1.00)
Commercial (×1.15)
Industrial (×1.25)
Warehouse (×1.10)
Hospitality (×1.20)
Reflects compliance and access complexity.
Treatment method
Spot treatment (×0.75)
Perimeter barrier (×0.90)
Full-coverage spray (×1.00)
Soil pre-treatment (×1.20)
Tenting / gas (×1.35)
Heat treatment (×1.50)
More intensive methods cost more.
Infestation severity
Low (×1.00)
Medium (×1.15)
High (×1.30)
Adjusts rework and monitoring allowance.
Access difficulty
Easy access (×1.00)
Moderate access (×1.10)
Difficult access (×1.20)
Confined spaces (×1.35)
Confined areas raise handling time.
Material cost per unit area