Generator Sizing Calculator for Construction

Plan temporary power with clear, itemized load schedules. Include motor surges and diversify usage safely. Download CSV or PDF for crews, bids, and audits.

Enter Project and Electrical Details

Project name is required.
Typical construction generators use 0.8 for mixed loads.
Common planning factor: 1.25 for continuous duty.
Helps cover added tools, shifts, and seasonal needs.
Higher altitude may reduce available generator output.
Hot conditions can reduce alternator and engine capacity.
If known from manufacturer curves, enter it here.

Add Loads

Tip: Use Demand % to model non-simultaneous usage. Set Surge Factor to 1 for resistive loads.
Enter a load name.