Construction Mode Split Calculator

Balance logistics choices with quantified tradeoffs. Test manual splits or modeled shares. Deliver practical outputs for site and supply planning.

Project Inputs
Modes
Enter per-trip values. Convenience is a 1–10 score. Capacity can be tons, pallets, or any consistent unit.
Mode Name Time (min) Cost/Trip Emissions (kg CO2) Convenience (1–10) Capacity/Trip Manual Share %
Tip: If modeled shares look extreme, reduce lambda or weights.
Example Data Table
Sample inputs for a site moving 100 loads per day.
ModeTime (min)Cost/TripEmissions (kg CO2)ConvenienceCapacity/Trip
Truck3512055710
Rail558530640
Barge757020560
Conveyor2040886
Formula Used

This calculator supports two approaches. In manual mode, you enter shares that sum to 100%. In modeled mode, it uses a multinomial logit structure with a generalized cost.

How to Use This Calculator
  1. Enter project name, date, and total daily trips or loads.
  2. Select a method: modeled shares for scenario testing, or manual shares for fixed allocations.
  3. Fill mode inputs using consistent units and realistic per-trip values.
  4. If using modeled shares, tune weights and lambda to match sensitivity.
  5. Press calculate to view results above the form, then export.

Notes: Keep all costs in the same currency and all emissions in kg CO2 per trip. If a mode is not used, set its manual share to 0% or give it high generalized cost.