Plan monitoring fees, scope changes, and reporting frequency. See totals, margins, and taxes instantly here. Make confident proposals using consistent calculations and exports always.
| Scenario | Hours | Visits | Duration (months) | Escalation | Overhead | Profit |
|---|---|---|---|---|---|---|
| Utility trench monitoring | 120 | 10 | 6 | 3% | 12% | 10% |
| Bridge retrofit instrumentation | 260 | 18 | 12 | 4% | 15% | 12% |
| High-rise settlement tracking | 420 | 26 | 18 | 5% | 18% | 14% |
Use the “Load Example Values” button to see a realistic set of inputs instantly.
Labor = Hourly Rate × Estimated Hours
Visits = Site Visits × Fee per Visit
Travel = (Travel Miles × Mileage Rate) + (Per Diem Days × Per Diem Rate)
Recurring = (Equipment Monthly + Software Monthly) × Contract Months
Change Allowance = Change Orders × Average Change-Order Cost
Escalation Factor = (1 + Annual Escalation%)^(Contract Months / 12)
Time-Driven Costs (Escalated) = (Labor + Visits + Recurring + Change Allowance) × Escalation Factor
Direct Cost = Base Fee + Travel + Time-Driven Costs (Escalated)
Pre-Tax Total = Direct Cost × (1+Overhead%) × (1+Profit%) × (1+Contingency%)
Grand Total = Pre-Tax Total + (Pre-Tax Total × Tax%)
Important Note: All the Calculators listed in this site are for educational purpose only and we do not guarentee the accuracy of results. Please do consult with other sources as well.