Repointing Mortar Calculator

Plan repointing projects with accurate mortar and materials. Choose brick sizes, joints, and mix ratios. Save reports to share with clients and crews securely.

Inputs

Enter wall, joint, and mix details

Use consistent units. Choose metric or imperial first.
Fields arranged 3 columns (large), 2 (medium), 1 (mobile).
Switching units changes labels; inputs are not auto-converted.
Use area mode when the wall is irregular.
m
m

Openings (optional)
Add windows/doors to deduct from repointing area.
Up to 3 opening types
m
m
m
m
m
m

Masonry details
Brick size and joint thickness affect joint length per area.
mm
mm
mm

Repointing parameters
Repointing depth is the raked-out depth filled with new mortar.
mm
mm
%
Typical: 8–15%. Increase for difficult access.
Default 1.33 converts wet mortar to dry ingredients volume.
Uncheck for bed-joint-only repointing.

Materials & mix
Ratios are by volume parts (Cement : Lime : Sand).
Material estimates use typical bulk densities.

Optional labor estimate
Use your crew’s known productivity for a realistic schedule.
m² / person-day
Example

Example input and output

Use this as a quick reference for typical settings.
Parameter Example value Notes
Wall area (net)10.0 m²After deducting 1.2 m² openings
Brick size215 × 65 mmCommon modular brick size
Joint thickness / width10 mmBed and perp joints
Repointing depth15 mmTypical raked-out depth
Mix ratio (C:L:S)1 : 1 : 6General repointing mortar
Waste allowance10%Adjust for access and tooling
Estimated wet mortar~0.030–0.050 m³Varies with joint geometry and profile
Formula

Formula used in this calculator

1) Net repointing area

If you enter wall length and height:

Wall Area = Length × Height
Net Area = Wall Area − Σ(Openings Width × Height × Quantity)

Area mode uses your entered total area, then subtracts openings.

2) Joint length per 1 m² (approx.)

Courses per meter = 1 / (Brick Height + Joint Thickness)
Bricks per meter (in a course) = 1 / (Brick Length + Joint Thickness)

Horizontal Joint Length = Courses per meter × 1.0 m
Vertical Joint Length = Courses per meter × Bricks per meter × Brick Height

This is a stretcher-bond approximation. For stone or irregular work, increase waste or adjust dimensions.

3) Mortar volume

Wet Volume per m² = (Total Joint Length) × (Joint Width) × (Repoint Depth) × (Profile Factor)
Total Wet Volume = Wet Volume per m² × Net Area × (1 + Waste%)

4) Ingredient split (dry)

Dry Volume = Total Wet Volume × Dry Factor
Cement Volume = Dry Volume × (Cement Parts / Total Parts)
Lime Volume = Dry Volume × (Lime Parts / Total Parts)
Sand Volume = Dry Volume × (Sand Parts / Total Parts)
Guide

How to use this repointing mortar calculator

  1. Select your unit system first, then enter all values in those units.
  2. Enter wall geometry using length × height or total area for irregular walls.
  3. Deduct openings for windows, doors, and large vents to avoid over-ordering.
  4. Set joint width and repointing depth based on a real site measurement.
  5. Choose a mix ratio or enter a custom ratio to match specifications.
  6. Adjust waste and profile factor for tooling style and access constraints.
  7. Calculate, review the result block, and download CSV/PDF for records.
History

Recent calculations (saved in this browser session)

No saved runs yet. Submit the form to store results here.

Related Calculators

Brick wall area calculatorBrick wall volume calculatorBrick wall thickness calculatorBrickwork labor calculatorBrick wastage calculatorBrick cutting allowance calculatorBrick bond pattern calculatorBrick course count calculatorBrick per square meter calculatorBrick pallet count calculator

Important Note: All the Calculators listed in this site are for educational purpose only and we do not guarentee the accuracy of results. Please do consult with other sources as well.