Single-file • Bootstrap + JS
CSV/PDF Export
Units: Metric/Imperial
Settings & Presets
Plan Geometry
Add one or more segments. For trapezoid, enter road length with start/end widths. For polygon, paste x,y per line.
| # | Type | L / Points | W | W₂ | Area | |
|---|---|---|---|---|---|---|
| Total Area | 0.00 | m² | ||||
Layers
Set compacted thickness, max lift, material & density.
| # | Layer | tcomp | Max lift | Material | Density | Lifts |
|---|
Production, Logistics & Cost
km
per ton-km
per ton
per m³
Total Area
0.00 m²
0 segments
Compacted Volume
0.000 m³
All layers
Total Tons
0.00 t
Compacted mass
Truckloads
0
Rounded up
Live Cross-Section
Diagram scales to total thickness; crown line is indicative.Bill of Materials (BOM)
| # | Layer | tcomp | Area | Vc | Vl | Density | Tons | Loads | Unit Cost | Line Cost |
|---|---|---|---|---|---|---|---|---|---|---|
| Totals | 0.00 | 0.000 | 0.000 | 0.00 | 0 | 0.00 | ||||
Material
0.00
Haul
0.00
Equip + Labor
0.00
Subtotal
0.00
Grand Total (+ contingency)
0.00
0.00 per m²
Tip: tweak layer thicknesses and materials; the diagram and BOM update instantly. Save your scenario via browser “Save Page As…” to keep a copy.