Enter Screen Details
Choose a screen type, set length and height, then adjust spacing and costs.
Example Data Table
| Scenario | Type | Length (m) | Height (m) | Spacing/Width (m) | Units (with extra) | Posts | Total cost |
|---|---|---|---|---|---|---|---|
| Backyard line | Hedge plants | 12.0 | 1.8 | 0.60 | 23 | 0 | 258.50 |
| Patio screening | Ready-made panels | 9.0 | 2.0 | 1.80 | 6 | 7 | 402.00 |
| Side yard | Trellis + climbing vine | 15.0 | 2.2 | 1.50 | 12 | 9 | 309.00 |
These examples use the same formulas as the calculator. Costs are placeholders; replace with your local pricing.
Formula Used
1) Units required
Living screens (hedge/bamboo/trellis):
Panels:
Living screens (hedge/bamboo/trellis):
units = ceil(length ÷ spacing) + 1Panels:
units = ceil(length ÷ panel_width)
2) Extra allowance
3) Posts (optional)
units_with_extra = ceil(units × (1 + extra% ÷ 100))3) Posts (optional)
posts = ceil(length ÷ posts_every) + 1 + corner_posts
4) Cost estimate
materials = (units_with_extra × unit_cost) + (posts × post_cost)total_initial = materials + labor_costannual_maintenance = user estimate
5) Time to reach target (living screens)
Set growth to 0 to skip this estimate.
need_cm = max(0, (target_height − current_height) × 100)months = need_cm ÷ growth_cm_per_monthSet growth to 0 to skip this estimate.
How to Use This Calculator
- Select a screen type: hedge, bamboo, trellis, or panels.
- Enter the run length and your desired target height.
- For living screens, set plant spacing; for panels, set panel width.
- Add extra allowance to cover replacements and cutting waste.
- Turn on posts if you want a quick support estimate.
- Press Calculate to view results and download reports.