Inputs
Used for required GPM.
Rough adjustment to volume.
Single-speed flow or VS reference.
Used if VS off or Auto RPM off.
to
0–24 (24-hour clock)
to
to
$
/kWh
Shape Visualizer
Plan is schematic; proportions update from inputs.
Avg depth: –
Footprint: –
Summary
–
Volume
–
Required Flow
–
Runtime / day
–
Energy Cost / day
Units:
Share URL:
| Recommended RPM | – |
|---|---|
| Operating Flow (GPM) | – |
| Power (W) | – |
| Energy (kWh/day) | – |
| Cost ($/month) | – |
Charts
Cost vs Turnovers/day (auto-sized schedule)
24h schedule (allocated by TOU)