Brick Bond Pattern Calculator

Plan bond layouts before ordering materials today. Choose pattern, enter dimensions, get counts fast easily. Export results to share with crews and clients quickly.

Calculator Inputs

Use one unit consistently for all inputs.
Counts are face-based; thickness scales totals.
Used as a multiplier and volume approximation.
Typical: 3–8% (more for complex patterns).

Used in module size and course height.

Openings

Add doors/windows to subtract area. This tool scales brick counts proportionally.
Qty Width Height Remove
Reset

Example Data Table

Sample inputs and outputs to sanity-check your entries.

Scenario Wall (L×H) Brick (L×W×H) Joint Pattern Thickness Waste Expected Output (approx.)
Typical boundary wall 6.0×2.7 m 0.19×0.09×0.057 m 0.01 m Running bond Single wythe 5% ~720–820 bricks, ~0.20–0.35 m³ mortar
One-brick thick façade strip 4.0×3.0 m 0.19×0.09×0.057 m 0.01 m English bond One-brick thick 7% ~1,250–1,500 bricks; headers + stretchers split
Accent panel 2.0×1.2 m 0.19×0.09×0.057 m 0.01 m Herringbone Single wythe 10% Higher waste; check cuts and module alignment

Formula Used

Core modules
  • Course height: Hc = brick_height + joint
  • Courses: N = ceil(wall_height / Hc)
  • Stretcher module length: Ls = brick_length + joint
  • Header module length: Lh = brick_width + joint
  • Openings factor: r = net_area / gross_area
This calculator estimates face bricks, then scales by wall thickness.
Pattern logic (face)
  • Running/Stack: B = ceil(wall_length / Ls) × N
  • Header: B = ceil(wall_length / Lh) × N
  • English: alternate header/stretcher courses using both Lh and Ls
  • Flemish: each course repeats header+stretcher units along the length
  • Totals: Bnet = ceil(B × r × thickness_multiplier)
  • Waste: Bfinal = ceil(Bnet × (1 + waste%))
Mortar volume is estimated as net wall volume minus installed brick volume. The wall thickness used is an approximation based on the selected thickness option.

How to Use This Calculator

  1. Select a unit and keep all dimensions in that unit.
  2. Enter wall length and height, then pick the bond pattern.
  3. Enter brick size and mortar joint thickness from your specification.
  4. Add openings for doors/windows to subtract area from the estimate.
  5. Choose wall thickness to scale face counts for multiple wythes.
  6. Set a waste percentage to cover cuts, breakage, and handling.
  7. Click Calculate, then download CSV/PDF for records.

Brick Bond Planning Notes

Why bond choice affects quantity

Brick bond is more than appearance; it changes how bricks repeat along a wall and how many cuts are needed at ends, corners, and openings. A running bond is usually the fastest to lay because most units are stretchers and the pattern can be carried with half-brick laps. Stack bond aligns vertical joints, so it often needs closer attention to alignment and may increase breakage on tight tolerances. English and Flemish bonds introduce headers to lock wythes and create a textured façade, but the header-to-stretcher mix affects how you stage materials and where you expect closers.

What this calculator is estimating

The estimator first calculates a face-brick count from wall length and height. It uses a “module” size (brick + mortar joint) to compute bricks per course, then multiplies by the number of courses. For English bond, it alternates stretcher and header courses; for Flemish bond, it repeats paired header-and-stretcher units along each course. Net wall area is found by subtracting openings, then applied as a proportional factor so the result stays quick and consistent.

Thickness, waste, and practical allowances

After face quantity is known, the tool scales totals with a thickness multiplier to approximate additional wythes. Waste covers breakage, trimming, and pattern starts. For simple runs, 3–5% is common; for feature panels, corners, and complex bonds, 7–12% is more realistic. The “half bricks” and “closers/cuts” lines are practical allowances, not a cutting list. Always cross-check corners, returns, soldier courses, and any special units shown on drawings.

Worked example (quick check)

Example inputs: wall 6.0 × 2.7 m, brick 0.19 × 0.09 × 0.057 m, joint 0.01 m, running bond, single wythe, 5% waste, no openings.

Output item Typical result (approx.) How to interpret
Estimated courses 41 Ceiling of wall height ÷ (brick height + joint).
Bricks (no waste) 1,230 Face count scaled by thickness multiplier.
Bricks (with 5% waste) 1,292 Rounded up to whole bricks for ordering.
Mortar (approx.) 0.259 m³ (≈259 L) Wall volume minus installed brick volume.

Use the example to validate units and inputs. If your output differs greatly, check unit selection, joint size, and whether openings or thickness were applied.

Field adjustments to consider

For long runs, confirm movement joints, control breaks, and any reinforced zones that change coursing. If the wall steps, slopes, or includes piers, split the takeoff into segments and sum results. Measure special units like cappings, returns, bullnose, and soldier bands separately, because they replace standard face bricks and can shift mortar demand.

FAQs

1) Which bond is best for most walls?

Running bond is common because it is fast, forgiving, and visually clean. Final selection should follow drawings, exposure conditions, and any structural or detailing requirements on the project.

2) Why does the calculator scale counts by openings area?

It applies a net-to-gross area factor to keep estimates simple and consistent. This is quick for budgeting, but it does not model local effects around jambs, lintels, or sills where cuts increase.

3) What does “wall thickness” change?

Thickness multiplies the face-brick quantity to approximate additional wythes and affects the wall volume used for mortar estimation. It is an estimating aid, not a substitute for a detailed section or takeoff.

4) How should I choose a waste percentage?

Use 3–5% for straight walls with standard units and minimal cutting. Use 7–12% for corners, returns, patterned panels, and herringbone areas. Increase waste if access, handling, or breakage risk is high.

5) Why are header and stretcher counts shown?

Some bonds require a mix of orientations, which can affect ordering, staging, and production planning. The split is especially useful for English and Flemish bonds, where headers and stretchers repeat in predictable sequences.

6) Can this be used for veneers or blockwork?

It is designed for brick units and common bonds. Veneer systems may require ties, cavities, and different detailing; blockwork has different module sizes. Use this as a starting point, then adjust with project-specific takeoff rules.

7) Why might mortar volume be different on site?

Mortar depends on joint profile, absorption, retempering, workmanship, and waste. The tool estimates volume by subtraction, so it is best for early planning. Field conditions can move totals noticeably either direction.

Related Calculators

Brick wall area calculatorBrick wall volume calculatorBrick wall thickness calculatorBrickwork labor calculatorBrick wastage calculatorBrick cutting allowance calculatorBrick course count calculatorBrick per square meter calculatorBrick pallet count calculatorBlockwork cost calculator

Important Note: All the Calculators listed in this site are for educational purpose only and we do not guarentee the accuracy of results. Please do consult with other sources as well.