Estimate canal lining area, volume, and costs quickly. Choose shapes, units, mix, and waste rates. Download clean reports for planning, ordering, and billing today.
| Section | Length (m) | Bottom (m) | Depth (m) | Slope Z | Thickness (mm) | Waste (%) | Area (m^2) | Volume (m^3) |
|---|---|---|---|---|---|---|---|---|
| Trapezoidal | 250 | 2.0 | 1.5 | 1.5 | 100 | 5 | ~1,304 | ~130.4 |
| Rectangular | 120 | 1.2 | 1.0 | - | 80 | 3 | ~384 | ~30.7 |
| Trapezoidal | 500 | 3.0 | 2.0 | 2.0 | 125 | 7 | ~3,869 | ~483.6 |
s = d * sqrt(1 + z^2)P = b + 2s (trapezoidal) or P = b + 2d (rectangular)A = (P * L) + (2 * e * L), where e is edge strip width per sideV = A * tA_w = A * (1 + w), V_w = V * (1 + w), where w is waste fractionSteel = (kg/m^2 rate) * A_w1.54 and split by ratio.Z in H:V.Important Note: All the Calculators listed in this site are for educational purpose only and we do not guarentee the accuracy of results. Please do consult with other sources as well.