Use mix proportions, water-cement ratio, and curing conditions to predict strength reliably. See maturity-based age curves, apply field factors, then export PDF or CSV.
Use ratio mode for quick checks or weights mode for mix-based entries.
Sample inputs and typical outputs for quick comparison.
| Scenario | w/c | Age (days) | Temp (°C) | Field | Est. Strength (MPa) |
|---|---|---|---|---|---|
| General slab | 0.55 | 28 | 20 | Good | ~25–35 |
| Structural column | 0.42 | 28 | 20 | Excellent | ~40–55 |
| Early stripping check | 0.45 | 7 | 25 | Good | ~60–75% of 28-day |
This estimator combines a water-cement strength relationship with a simple age-growth model and practical modifiers:
Concrete compressive strength governs formwork stripping, post-tensioning timing, saw-cut windows, and loading restrictions. While laboratory cylinders remain the accepted verification method, an estimate helps crews plan sequencing A realistic estimate combines mix proportion indicators with curing conditions and workmanship effects.
Lower water-cement ratios generally improve strength and durability. In practice, many general slabs target about 0.50–0.60, while structural work often uses roughly 0.35–0.50 depending on exposure class and workability requirements. Excess water can increase capillary porosity and lower 28-day results.
Common construction specifications range from about 20–30 MPa for pavements and light-duty slabs to 30–45 MPa for structural elements. Higher-performance mixes (50–70+ MPa) may be used for high-rise cores, bridges, or heavy industrial floors when demands rise.
Strength gain is rapid at early ages and then slows. A widely used planning rule is that 7-day strength may reach roughly 60–75% of 28-day strength, and 3-day strength may reach about 35–55%, depending on cement type, temperature, and curing quality. This calculator shows a quick age curve to support these checkpoints.
Curing temperature affects hydration rate. Around 20 °C, mixes tend to follow “normal” development. Colder conditions can delay early strength, while warmer curing can accelerate early gain. Moist curing, insulation, and evaporation control reduce variability and help the estimate match reality.
High-early cement can improve early results when schedules are tight, whereas blended or low-heat binders may develop strength more slowly. Chemical and mineral admixtures can shift strength upward or downward depending on dosage and compatibility. Enter a percentage adjustment when you have project-specific expectations from mix submittals or trial batches.
Placement method, consolidation, finishing, and curing protection strongly influence achieved strength. Air entrainment improves freeze-thaw performance but can reduce compressive strength if air content rises above the designed range. The field-quality setting provides a modifier to reflect these on-site realities.
Use the age estimate for planning and the conservative check for comparisons, not as a substitute for acceptance testing. For critical elements, verify with cylinders, maturity testing, or core testing per your project specification. Record inputs and export the report so your site diary includes assumptions and conditions.
No. It supports planning and documentation, but acceptance should rely on specified testing methods such as cylinders, maturity measurements, or cores.
Use the mix design or batch ticket when possible. Slump alone is not enough; added water can change w/c significantly and reduce strength.
Lower temperatures slow hydration reactions. Early-age gain can be delayed, which affects stripping and loading. Proper curing protection helps maintain development.
Warm curing often boosts early strength, but very high temperatures can increase microcracking risk and sometimes reduce later-age gains. Keep curing practices controlled.
It is a user-applied adjustment. For best results, base it on trial batches, supplier data, or historical project performance under similar conditions.
Field conditions vary. A margin creates a conservative planning value, helping reduce risk when scheduling formwork removal, loading, or post-tension operations.
Export the PDF or CSV with inputs, estimated strength, and age curve. Keep it with batch tickets, curing logs, and test results for traceability.