Select conduit type, size, and conductor counts easily. Auto-check allowed fill limits for every scenario today. Export results to CSV or PDF for records.
Estimates for planning—confirm with local code, exact wire, and conduit specs.
Meta words: 25 | Tagline words: 24
| Conduit type | Trade size | Insulation | Groups | Total conductors | Estimated fill % | Status |
|---|---|---|---|---|---|---|
| EMT | 1 | THHN/THWN-2 | 6×12 AWG | 6 | ~9.24% | Within allowable fill |
| PVC Sch 40 | 3/4 | XHHW-2 | 4×8 AWG + 1×10 AWG | 5 | ~35–40% | Check result |
Examples are illustrative and depend on exact conductor and conduit specs.
Where f(N) is the fill factor: 0.53 (1), 0.31 (2), 0.40 (3+).
Conduit fill controls heat dissipation, pulling tension, and long-term serviceability. Overfilled raceways can increase installation effort and raise the risk of insulation damage during pulls. A documented fill check helps reduce rework.
A widely used rule set applies different limits by conductor count: one conductor allows up to 53% of conduit area, two conductors allow 31%, and three or more conductors allow 40%. This calculator applies those limits to estimate allowable occupied area and flags when your bundle exceeds the selected limit.
The method is area-based: each conductor has an approximate cross-sectional area (in²) tied to wire size and insulation type. The total occupied area equals the sum of (area each × quantity). Fill percent equals total conductor area divided by conduit internal area, multiplied by 100.
Real installations often mix sizes for feeders, branch circuits, and equipment grounds. Use separate rows for each size group to keep calculations transparent. If you are combining circuits, verify derating, temperature ratings, and any project-specific requirements, then use the exported report for coordination with field teams.
Different conduit types with the same trade size can have different internal areas. A small change in internal area can significantly shift allowable capacity when you are near the limit. For borderline cases, use the custom conduit area option to input manufacturer data for the exact product installed on site.
Focus on four values: conduit internal area, total conductor area, allowed area, and remaining capacity. If the status shows an exceedance, try stepping up one trade size, splitting circuits into parallel runs, or revising the conductor mix. The “extra possible” estimate helps you see practical margin by size.
Conductor areas vary by insulation build, manufacturer, and updates to standards. Treat the built-in values as planning-grade inputs. When compliance decisions are critical, replace estimates with documented areas and conduit data, then keep the download file as part of your quality record set.
Use the CSV export for takeoffs and scheduling, and the PDF export for inspections or daily reports. Confirm conduit selection, validate the conductor set, record the fill check, and communicate the pathway before pulling begins.
Each insulated wire you place in the raceway counts. Include hots, neutrals, and equipment grounds when they are insulated conductors. Check project rules for special cable assemblies and mixed wiring methods.
As conductor count increases, pulling friction and heat management become more limiting. The lower allowance for two conductors and the standard allowance for three or more help maintain safe installation and service conditions.
No. Values are representative estimates by insulation family and size. Exact areas depend on manufacturer and insulation build. For compliance-critical work, enter verified data through the custom area approach and keep documentation.
Use it when your conduit product has a published internal area that differs from common tables, or when you need to match a submittal exactly. This improves accuracy for tight designs and inspection documentation.
Add a separate row for each size and quantity. The calculator sums the subtotals to get total occupied area and fill percent. This approach is clearer than trying to average sizes or convert everything to one equivalent.
Increase the trade size, split the run into multiple conduits, or adjust the conductor set. Recalculate until status shows within allowable fill. Then export the report for coordination and field verification.
No. Fill checks raceway capacity by area. Ampacity and derating depend on conductor count, temperature ratings, and installation conditions. Perform derating checks separately and keep both records aligned with the final design.