Construction Dumpster Size Calculator

Choose a dumpster confidently for any job today. Compare standard sizes, weights, and optional pricing easily. Download results as CSV or simple PDF reports.

Calculator
Pick the approach that matches your job estimate.
Typical range: 10–25% depending on sorting.
Leaves headroom to avoid overfilling.
Used when estimating by area.
Used when estimating by area.
Example: drywall pile height, slab depth.
0.8 packs well, 1.0 typical, 1.1 loose.
Use if you already have cubic yards.
Common for cleanouts and small demos.
Default 2.5 yd³ is a typical heaped load.
Count heavy-duty debris bags if used.
Default assumes a ~40–45 gallon bag.
Useful for soil, gravel, and yard debris.
Default 0.10 yd³ fits many common carts.
Density drives the weight-limit check.
Used only when “Custom density” is selected.
Optional: provider weight limits (tons)
Leave blank to use default.
Leave blank to use default.
Leave blank to use default.
Leave blank to use default.
Leave blank to use default.
Leave blank to use default.
Leave blank to use default.
Leave blank to use default.
Leave blank to use default.
Tip: For heavy debris, providers may require smaller containers.
Optional: cost estimate
Enter your quoted base price.
Enter 0 if none included.
Applied above included tonnage.
Drop-off, pickup, or admin fees.
Costs depend on local pricing, distance, and disposal rules.
Example data table
Job Method Inputs Debris Adjusted volume (yd³) Estimated weight (tons) Suggested size
Bathroom remodel Itemized 4 pickup loads, 10% waste, 85% fill Mixed debris 11.00 2.75 12 yd³
Roof tear-off Volume 18 yd³, 20% waste, 85% fill Shingles 21.60 8.64 Multiple loads or heavy-debris plan
Concrete patio demo Area 20×12 ft, 4 in, 15% waste, 85% fill Concrete 3.41 4.43 10 yd³ with strict weight limit checks
Examples are illustrative; actual loads vary by material, moisture, and packing.
Formula used
  • Area → volume: volume(ft³) = length(ft) × width(ft) × thickness(ft)
  • Convert: volume(yd³) = volume(ft³) ÷ 27
  • Adjust for packing: adjusted volume = raw volume × compaction factor
  • Add waste: final volume = adjusted volume × (1 + waste% ÷ 100)
  • Estimate weight: tons = final volume(yd³) × density(tons/yd³)
  • Choose size: pick the smallest dumpster meeting volume and weight targets, using a safe fill percentage.
Weight limits and accepted materials vary by provider and municipality.
How to use this calculator
  1. Select an estimation method that matches your information.
  2. Enter measurements, volume, or itemized loads as needed.
  3. Pick a debris density, or enter a custom value.
  4. Set waste allowance and target fill level for headroom.
  5. Optionally enter provider weight limits and cost details.
  6. Press calculate to see volume, weight, and a recommended size.
  7. Use the CSV or PDF buttons to save the results.
Professional guide to dumpster sizing

Why sizing accuracy protects your schedule

Choosing the right container is a planning decision, not just a rental choice. Undersizing creates extra hauls, delays crews, and adds disposal trips. Oversizing can raise base fees and place an oversized box where access is tight. A quick volume-and-weight estimate keeps labor moving and reduces surprise overage charges.

Standard roll-off sizes used on job sites

Common capacities range from 10 to 40 cubic yards. Smaller 10–15 yard containers suit room remodels and cleanouts. A 20 yard size often fits flooring, decking, and moderate demolition. Larger 30–40 yard containers are used for whole-home projects, large framing waste, or bulky packaging.

Turning measurements into cubic yards

When you know the footprint and pile height, calculate cubic feet using length × width × thickness, then divide by 27 to convert to cubic yards. For example, 20 ft × 12 ft × 4 in equals 80 ft³, or about 2.96 yd³ before allowances. This calculator automates that conversion.

Material density drives weight, not just space

Heavy materials can reach weight limits long before the box looks full. Typical mixed debris is roughly 0.25 tons per cubic yard, while shingles can be around 0.40. Soil, concrete, and masonry can exceed 1.0 ton per cubic yard, so smaller containers may be required.

Waste factor and safe fill percentage

Waste allowance accounts for broken pieces, voids, and sorting inefficiency. Many projects use 10–25% depending on demolition complexity. A target fill level (often 85%) leaves headroom to avoid overfilling and helps match real loading behavior where materials do not pack perfectly.

One large container or multiple pulls

If volume fits but weight does not, multiple loads can be cheaper than heavy overage fees. This calculator checks both targets: it recommends the smallest size that meets volume and tonnage limits, or suggests multiple loads when no single option satisfies both constraints.

Access, placement, and workflow considerations

Plan delivery space, turning radius, and a clear loading path. Keep the container close to the work zone to reduce carry time, but avoid blocking egress. Confirm surface protection on driveways and verify local rules for restricted items like appliances, liquids, or treated wood.

Practical estimating tips for better results

Separate heavy debris into dedicated smaller containers, keep mixed waste for light-to-medium materials, and re-check estimates after the first day of demo. If you track pickup loads or bag counts, itemized estimating can be surprisingly accurate for repeatable tasks.

FAQs

1) What dumpster size is best for a single-room remodel?

Many single-room remodels fit a 10–15 yard container. Use the itemized method if you can estimate pickup loads, then apply a waste allowance to account for bulky trim, drywall, and packaging.

2) Why does the calculator ask for a fill percentage?

Containers rarely load to the exact rim safely. A fill percentage reserves headroom so you can close out the job without overflowing, and it provides a more realistic target for choosing the next standard size.

3) How do weight limits affect heavy debris like concrete?

Concrete and masonry are very dense, so weight limits can be reached quickly. You may need a smaller container, multiple loads, or a specialty heavy-debris option even when your estimated volume seems low.

4) What density should I choose for mixed construction waste?

Start with mixed debris if the load includes wood, drywall, and general trash. If the load is mostly one material, pick that category. When unsure, use a conservative density to reduce overage risk.

5) Can I override the provider’s weight limits in the form?

Yes. Enter your provider’s published ton limits to match your quote. Leaving fields blank uses typical defaults, but local policies and landfill rules can be stricter for shingles, soil, or masonry.

6) How is the optional cost estimate calculated?

The estimate adds the base rental, optional flat fees, and overage charges when your calculated tons exceed the included tons. If multiple loads are required, the calculator scales included tons and rental costs by load count.

7) What should I do if my job falls between two sizes?

Choose the next larger size if access allows, or increase pickups for tighter sites. Adding waste allowance and using a lower fill target typically pushes borderline jobs into the safer option.

Measure, estimate, choose, and schedule pickups with fewer surprises.