Plan mixer rentals with accurate, transparent cost estimates. Compare hourly, daily, weekly, or per-load pricing. Adjust fees and taxes, then download your results instantly.
| Scenario | Unit | Qty | Base rate | Trips | Km / trip | Operator | Fuel % |
|---|---|---|---|---|---|---|---|
| Small slab pour | Hour | 6 | 160 | 2 | 10 | Included | 6 |
| Day rental with standby | Day | 1 | 950 | 3 | 18 | Included | 5 |
| Weekly site batching support | Week | 1 | 4200 | 10 | 12 | Included | 7 |
| Per-load deliveries | Load | 8 | 140 | 8 | 22 | Included | 6 |
| Operator billed separately | Hour | 10 | 150 | 4 | 16 | Excluded | 4 |
Transit mixer rentals typically cover the truck, mixing drum, basic maintenance, and the ability to keep concrete workable during transport. Many suppliers include standard operating time, while waiting beyond an agreed window becomes chargeable. This calculator separates equipment, operator, mileage, and fees so your estimate matches how invoices are usually structured.
Hourly rentals suit short pours and jobs with uncertain site readiness. Daily rates work best for full-shift usage, often assuming an 8-hour day. Weekly pricing can reduce the average rate for multi-day work. Per-load pricing fits delivery-style work, where each load represents a production cycle. Select the unit that matches your quote.
Common drum capacities fall around 6–10 m³, but effective output depends on batching, haul distance, traffic, and discharge conditions. If billing per load, the “hours per load” field converts loads into billable time for day estimates and insurance. A typical planning range is 1.0–1.5 hours per load for nearby sites.
Mileage costs are calculated as (trips × distance per trip) × per-km rate. Use one round-trip distance if your supplier charges both ways, or a one-way distance if that’s how the contract is written. If you are unsure, run two estimates to bracket the likely total and choose the safer budget.
Operator cost is often tied to billable hours, but some suppliers bill operator separately. Standby time can arise from pump delays, rebar issues, access constraints, or slump adjustments. Overtime is modeled as overtime hours × base rate × multiplier. Keep overtime realistic by using your site plan and anticipated pour sequencing.
Delivery, pickup, washout, and environmental fees can be fixed amounts per job. Fuel surcharge is applied as a percentage on the subtotal before discount, reflecting common invoicing practice. When comparing suppliers, normalize these items: a slightly higher base rate may still be cheaper if fees are lower and fuel surcharge is capped.
Insurance is estimated per day using your billable hours divided by hours-per-day. Damage waiver is calculated as a percentage of equipment cost, which can be a common approach for optional coverage. Deposits reduce balance due, but they don’t change the true cost, so the calculator reports both grand total and remaining balance.
Use the breakdown to create a purchase order line-by-line: equipment, operator, transport, and fees. Add a contingency if your project has access risks or uncertain scheduling. Export the CSV for spreadsheets and the PDF for approvals. For best accuracy, align the inputs with the supplier’s contract wording and pay items.
Use the unit that matches your supplier’s quote. Per hour is better for variable site conditions. Per load is better for consistent deliveries where each trip is billed as a discrete service.
It enforces a minimum billable amount. If you enter 2 hours but the minimum is 4, the calculator bills 4. This mirrors common rental terms where short jobs still pay a minimum.
Start with your planned pour duration and add realistic delays: access setup, pump coordination, and finishing hold-ups. Overtime is only the portion beyond the planned rental window, not the full shift.
It depends on the contract. If unclear, run two estimates: one using one-way distance and one using round-trip distance. Use the higher total for safer budgeting.
Many rentals price insurance daily. The calculator converts your usage into estimated billable days using billable hours and your hours-per-day setting, then multiplies by the daily insurance amount.
Fuel surcharge is applied to the subtotal before discount and tax. This aligns with typical invoicing where fuel is a percentage add-on to the service and transport components.
Yes. After you calculate, use “Download CSV” for spreadsheets and “Download PDF” for approvals. Both exports reflect the same inputs and itemized breakdown shown on screen.