Plan sizing using wattage, surge, derating, and reserve. Compare single and three phase needs easily. Reduce outages with smarter generator sizing decisions every time.
The page stays single column, while the input grid shifts to three, two, and one columns by screen size.
The graph compares each load’s running kVA, extra starting kVA, and the resulting step event burden.
| Load | Qty | Running W Each | Start Multiplier | PF | Demand % | Start Units Together |
|---|---|---|---|---|---|---|
| LED Lighting | 40 | 18 | 1.00 | 0.95 | 100 | 0 |
| Air Conditioner Compressor | 2 | 2200 | 3.20 | 0.88 | 100 | 1 |
| Water Pump | 1 | 1500 | 3.00 | 0.82 | 100 | 1 |
| Server Rack | 1 | 2800 | 1.10 | 0.96 | 100 | 0 |
| General Receptacles | 20 | 150 | 1.00 | 0.95 | 60 | 0 |
Adjusted Running Watts
Qty × Running Watts Each × Demand Factor
Running kW
Adjusted Running Watts ÷ 1000
Running kVA
Adjusted Running Watts ÷ Power Factor ÷ 1000
Extra Starting kVA
Start Units × Running Watts Each × (Start Multiplier − 1) ÷ Power Factor ÷ 1000
Largest Step Start
Total Running kVA + Largest Extra Starting kVA
Simultaneous Step Start
Total Running kVA + Sum of Extra Starting kVA
After Derating
Base Required kVA ÷ (1 − Derate %)
Final Required kVA
After Derating × (1 + Reserve Margin %)
Generators are commonly rated in kVA because apparent power reflects both real power and power factor. Using only kW can underestimate alternator loading when motors or inductive loads have lower power factors.
It estimates inrush demand during equipment startup. Motors, compressors, and pumps often draw several times their running watts for a short period. That temporary surge can control generator sizing more than steady running load.
Use simultaneous mode when multiple motors may restart together after transfer, or when the control sequence does not stagger loads. It gives a more conservative result and helps reduce undersizing risk.
Derating accounts for performance loss from altitude, ambient temperature, or other site conditions. Real generators can deliver less capacity outside standard conditions, so derating helps keep the installed unit realistic.
Reserve margin covers future expansion, measurement uncertainty, and operational changes. It also reduces the chance that the selected generator will run too close to its limit during real standby events.
No. This tool is excellent for planning, budgeting, and preliminary design. Final selection should still be checked against manufacturer data for voltage dip, short-circuit performance, altitude limits, and compliance rules.
Yes. UPS systems, VFDs, rectifiers, and switch-mode supplies may add harmonics or require special alternator sizing. Review THD limits, neutral loading, and waveform sensitivity before finalizing the generator.
Yes. The method works for houses, offices, retail spaces, data rooms, and mixed facilities. The main requirement is entering realistic running watts, demand factors, and motor starting assumptions.
Important Note: All the Calculators listed in this site are for educational purpose only and we do not guarentee the accuracy of results. Please do consult with other sources as well.