Backup Window Planner Calculator

Design backup schedules that fit your cloud capacity. Compare full, incremental, and differential strategies easily. See your safest window, start time, and bandwidth needs.

Label for reports and exports.
Example: Primary region, DR site, staging.
Total data protected by the job.
Skip caches, temp files, and non-critical paths.
Used for incremental and differential runs.
Tip Differential grows with days since last full.
Only impacts differential planning.
1.0 means no compression savings.
Savings from repeated blocks across backups.
Sustained throughput, not peak speed.
Parallelism can help until bottlenecks hit.
Lower values model contention and locks.
Cap from target storage, repo, or disks.
TLS, encryption, retries, chatter, latency.
Compression, hashing, indexing, scanning.
Extra time for integrity checks and scans.
Cataloging, replication, or metadata updates.
Used to estimate finish time.
Total time allowed for backup and checks.
Reset

Example data table

Scenario Dataset (GiB) Type Change (%) Bandwidth (Mbps) Window (h) Result
VM fleet, nightly 2048 Incremental 8 500 6 Fits with buffer
File shares, weekly 8192 Full 1000 10 May exceed window
Database, midweek 1024 Differential 12 300 5 Tune bandwidth
These examples are illustrative. Your environment and tooling can shift results significantly.

Formula used

This planner estimates transfer size, throughput, and time using a practical bottleneck model.
  • Logical protected data (GiB) depends on backup type:
    • Full: L = Dataset
    • Incremental: L = Dataset × (DailyChange% / 100)
    • Differential: L = min(Dataset, Dataset × (DailyChange% / 100) × DaysSinceFull)
  • Transfer size (GiB) after reductions:
    T = (L × (1 − Exclude%)) × (1 − Dedupe%) ÷ CompressionRatio
  • Network throughput (MiB/s) from Mbps:
    NetMiB/s ≈ (Mbps ÷ 8) × (1000 ÷ 1024)
  • Parallel streams scaling with efficiency:
    Scale = 1 + (Streams − 1) × StreamEfficiency%
  • Bottleneck throughput before overhead:
    Raw = min(NetMiB/s × Scale, StorageLimitMiB/s)
  • Effective throughput with overhead penalties:
    Effective = Raw × (1 − ProtocolOverhead%) × (1 − CPUOverhead%)
  • Total duration with verification and post-processing:
    Duration = (TransferMiB ÷ Effective) × (1 + Verify% + PostProcess%)

How to use this calculator

  1. Enter your dataset size and choose the backup type you run.
  2. For incremental or differential, set a realistic daily change rate.
  3. Add compression and dedupe estimates from recent job logs.
  4. Set sustained bandwidth and a storage write limit for your repository.
  5. Adjust overhead and verification to match your tooling and security needs.
  6. Click Calculate backup window to see duration, finish time, and buffer.
  7. If the plan overruns, use the required bandwidth and storage targets as a sizing guide.

Operational context for backup windows

Backup windows are constrained by three numbers: protected data, end‑to‑end throughput, and allowable time. In mid‑size cloud estates, datasets commonly range from 500 to 10,000 GiB per policy domain. A 2,048 GiB workload with an 8% daily change produces about 163.8 GiB of logical incremental data before reductions.

Transfer size drivers and reduction levers

Transfer size shrinks when exclusions, deduplication, and compression are tuned. Excluding 5% of non‑critical paths removes 102.4 GiB from a 2,048 GiB full run. A 15% dedupe benefit on the remaining set lowers bytes by another 15%. With a 1.8 compression ratio, the transfer payload is divided by 1.8, often cutting nightly traffic by 40–55%.

Throughput modeling and bottleneck detection

Throughput is usually limited by the slowest link: network or repository writes. 500 Mbps sustained bandwidth converts to roughly 61.0 MiB/s. With four streams at 55% efficiency, modeled scaling reaches about 162.7 MiB/s, but a 450 MiB/s repository ceiling will not constrain this case. Add 12% protocol and 10% CPU overhead, and effective throughput becomes about 128.7 MiB/s.

Verification, post-processing, and safety buffers

Verification and post‑processing must be reserved explicitly. Integrity scans, catalog updates, and replication can add 5–20% depending on tooling. In the default profile, 8% verification plus 4% post‑processing increases runtime by 12%. A 1.5 hour transfer can become 1.68 hours, which matters when change rates spike after patch cycles or large migrations.

Capacity planning actions from planner outputs

Use the planner to size capacity and set safer start times. If the plan overruns, the required bandwidth output gives a concrete target for network upgrades or throttling policy changes. When storage is flagged as the bottleneck, raising repository write throughput or adding cache tiers often yields faster wins than increasing streams alone. For differential jobs, remember that days since the last full backup multiplies the change rate. At 12% change and three days since full, the differential logical set is about 737.3 GiB before reductions, which can shift a job from “fits” to “overrun.” Track real job logs weekly, update overhead values after enabling encryption or immutability, and keep at least 20–30 minutes of buffer for retries. Document these assumptions in runbooks so teams can audit changes quickly later.

FAQs

1) What should I use for “daily change”?

Use measured change from recent backup reports or storage analytics. If unknown, start with 5–12% for mixed VM and file workloads, then refine weekly using job history.

2) Why does adding streams sometimes not help?

Parallelism helps only until another component saturates. If storage writes, CPU, or a gateway link is limiting, extra streams increase contention without raising effective throughput.

3) How do I estimate protocol and CPU overhead?

Compare observed throughput to raw link capacity and repository benchmarks. Encryption, WAN latency, and small files raise protocol overhead; compression, hashing, and indexing raise CPU overhead.

4) What does “required bandwidth to fit” mean?

It is the sustained bandwidth target needed to complete within the chosen window, assuming the same stream scaling and overhead. Treat it as a sizing goal, not a guaranteed outcome.

5) When should I prefer differential over incremental?

Differential can simplify restores because it needs the last full plus the latest differential. However, it grows each day since the last full, so ensure the window supports that growth.

6) Can this planner replace a real benchmark run?

No. Use it for first-pass sizing and change impact checks. Validate with pilot jobs, observe throttling and retries, and then update the inputs to match measured behavior.