BMS Project Cost Calculator

Capture every controller, sensor, and point in minutes. Tune rates, margins, contingency, and taxes for clarity. Generate totals, unit costs, and shareable downloads instantly.

Enter your scope, costs, and percentages, then press Calculate.
Inputs
Use the form to estimate a complete BMS project budget.
Used for display and exports.
Total I/O points, including software points if counted.
Applied on direct subtotal (equipment + labor).
Applied on direct subtotal to cover unknowns.
Applied after overhead + contingency.
Applied on subtotal + overhead + contingency + profit.
Reset
Example data table
Sample inputs and a typical summarized output.
Category Example inputs Example value
Scope Total points 350
Equipment Controllers / Sensors / Actuators 8 / 120 / 45
Labor Engineering / Programming / Commissioning (hours) 80 / 120 / 100
Markups Overhead / Contingency / Profit / Tax (%) 10 / 7 / 12 / 5
Output Grand total (depends on unit rates) Computed after you calculate
Tip: Adjust unit costs and hourly rates to match local market quotes.
Formula used
How the estimate is built from your inputs.
  • Equipment Total = Σ(qty × unit cost)
  • Labor Total = Σ(hours × hourly rate)
  • Direct Subtotal = Equipment Total + Labor Total
  • Overhead = Direct Subtotal × (Overhead% / 100)
  • Contingency = Direct Subtotal × (Contingency% / 100)
  • Profit = (Direct Subtotal + Overhead + Contingency) × (Profit% / 100)
  • Tax/VAT = (Direct Subtotal + Overhead + Contingency + Profit) × (Tax% / 100)
  • Grand Total = Direct Subtotal + Overhead + Contingency + Profit + Tax/VAT
  • Cost per Point = Grand Total / Total Points
If your company applies markups differently, update the percentage logic to match your policy.
Project costing guidance
A professional, data-driven approach for reliable estimates.

1) Define scope with point counting

A building management system estimate is strongest when it separates hardware, software, and services. Start by confirming the point count from drawings and schedules, because points drive controller sizing, wiring effort, programming, and commissioning time. For many projects, 250–600 points is common, so a quick cost-per-point check helps validate early budgets.

2) Build a realistic equipment bill

Accurate device pricing comes from a clear bill of materials. Controllers, sensors, actuators, meters, and panels should be priced with freight and spares in mind. If a sensor averages 35 each and you need 120 units, that line alone is 4,200. Small variances across high quantities can move the total materially.

3) Separate labor into controllable buckets

Labor is typically the largest uncertainty. Split hours into engineering, programming, installation, commissioning, and project management so you can adjust each based on site complexity. For example, programming at 55 per hour for 120 hours equals 6,600, while commissioning at 60 per hour for 100 hours equals 6,000. Tracking these buckets improves future estimates.

4) Apply markups consistently and transparently

Markups should mirror your internal policy and client contract. This calculator applies overhead and contingency on direct costs, then profit, then tax or VAT. Using 10% overhead, 7% contingency, and 12% profit provides a transparent, reviewable ladder of additions that stakeholders can approve.

5) Validate results and communicate assumptions

Finally, use the result outputs to communicate scope and assumptions. Share the equipment and labor breakdown, and export CSV or PDF for approvals, tender submissions, or change control. Revisiting inputs as quotations arrive keeps the estimate aligned with the real market.

As a benchmark, divide the grand total by total points. If the calculated cost per point is far above historical norms, re-check point counting rules, panel quantities, and installation hours. If it is far below, confirm whether networking, software licensing, graphics, and training are included. Document assumptions in the notes section so revisions are controlled and defensible during review cycles.

FAQs
Common questions for using the calculator in real projects.

Should I include software points in total points?

Yes, if your standards count soft points that require graphics, trends, alarms, or logic. Keep the counting rule consistent across projects so cost per point comparisons remain meaningful.

How do I price controllers when brands differ?

Use vendor quotes where possible. If early design is brand-agnostic, price a conservative average and add contingency. Update unit costs as soon as the preferred manufacturer and protocol are confirmed.

What labor hours are typical for commissioning?

It depends on system complexity and integration. A rough starting range is 0.2–0.6 hours per point, then adjust for after-hours work, seasonal testing, and third‑party witnessing requirements.

Where do training and handover costs go?

Add them to labor, usually under project management or commissioning, depending on who delivers training. If training is a separate line item in your contract, keep it as a dedicated cost bucket.

How should I handle tax or VAT?

Apply the percentage to the taxable base your jurisdiction requires. Some projects tax materials only, others tax services too. Set the rate accordingly and document what is included in the taxable base.

Why is my cost per point unusually high?

Check for double-counted devices, inflated installation hours, or expensive licensing. Also confirm point count rules and whether you included integration, graphics, trending, and warranty support that past projects excluded.

Can I use this for change orders?

Yes. Duplicate the baseline inputs, then modify only the changed quantities, hours, and markups. Export both versions to show deltas clearly and support negotiation with transparent assumptions.

How to use this calculator
A quick workflow for consistent estimates.
  1. Count total BMS points and major device quantities.
  2. Enter equipment unit costs from vendor quotations.
  3. Enter hours and rates for engineering, programming, and site work.
  4. Set overhead, contingency, profit, and tax/VAT percentages.
  5. Press Calculate to view results above the form.
  6. Use CSV/PDF buttons to export for review and approvals.

Estimate smarter, budget clearer, deliver BMS projects confidently today.

Related Calculators

Paver Sand Bedding Calculator (depth-based)Paver Edge Restraint Length & Cost CalculatorPaver Sealer Quantity & Cost CalculatorExcavation Hauling Loads Calculator (truck loads)Soil Disposal Fee CalculatorSite Leveling Cost CalculatorCompaction Passes Time & Cost CalculatorPlate Compactor Rental Cost CalculatorGravel Volume Calculator (yards/tons)Gravel Weight Calculator (by material type)