Cable Trench Volume Calculator

Plan trenching quantities for ducts and power cables. Choose shapes, units, and allowances fast here. Download clean summaries for bids, audits, and site logs.

Trench Inputs

Used for report file names.
All dimensions below use this unit.
Trapezoidal uses a per-side H:V slope ratio.
Centerline trench length.
Clear excavation width at base.
From finished grade to trench bottom.
Example: 0.5 means 0.5H:1V on each side.
Extra depth for soft spots or trim allowance.
Multiply volumes for multiple runs.

Materials and Adjustments

Set to zero if not used.
Adds clearance on both sides for bedding width.
Used to estimate loose spoil volume.
Loose required = compacted ÷ (factor/100).
Applied to all reported volumes.
0–6 decimals.

Optional Duct and Encasement

Used as displacement inside the trench.
Set to zero if not applicable.
Prismatic volume, thickness × width × length.
Use with thickness to include encasement volume.
Reset

Example Data Table

Scenario Shape L (m) B (m) D (m) Slope Waste (%) Excavation (m³)
Urban LV cable trench Rectangular 30 0.45 0.90 0.00 5 12.758
Road crossing with side slopes Trapezoidal 20 0.60 1.20 0.50 7 20.196
Shallow trench for controls Rectangular 15 0.30 0.60 0.00 3 2.781
Example excavation values include the shown waste allowance.

Formula Used

Cross-sectional area
  • Rectangular: A = B × Deff
  • Trapezoidal: Top width T = B + 2 × s × Deff
  • Trapezoidal: A = (B + T) ÷ 2 × Deff
  • U-shaped: A ≈ (B × (Deff − r)) + (πr² ÷ 2), r = B/2
Volumes and factors
  • Excavation: Vexc = A × L × n
  • Bedding: Vbed = (B + 2c) × t × L × n
  • Duct displacement: Vduct = (π(OD/2)²) × L × count
  • Backfill (compacted): Vbf = Vexc − Vbed − Venc − Vduct
  • Loose spoil: Vloose = Vexc × (1 + swell%)
  • Loose backfill needed: Vbf,loose = Vbf ÷ (compaction%/100)
  • Waste applied: Vfinal = V × (1 + waste%/100)
Deff includes over-excavation. s is the per-side horizontal-to-vertical slope ratio. The calculator converts everything to meters internally.

How to Use This Calculator

  1. Select the input units and trench shape.
  2. Enter length, bottom width, and depth using your chosen units.
  3. For trapezoidal trenches, set the side slope ratio (H:V per side).
  4. Add bedding thickness and clearance if bedding is used on site.
  5. Enter swell, compaction, and waste values that match your method statement.
  6. Optionally include ducts and encasement to refine backfill quantities.
  7. Click Calculate. Then download CSV or PDF for records.

Related Calculators

Paver Sand Bedding Calculator (depth-based)Paver Edge Restraint Length & Cost CalculatorPaver Sealer Quantity & Cost CalculatorExcavation Hauling Loads Calculator (truck loads)Soil Disposal Fee CalculatorSite Leveling Cost CalculatorCompaction Passes Time & Cost CalculatorPlate Compactor Rental Cost CalculatorGravel Volume Calculator (yards/tons)Gravel Weight Calculator (by material type)