CMU Mortar Calculator

Plan blockwork accurately using customizable wall dimensions, openings, and joint settings alone. See mortar volume, bags, water, and budget totals instantly, then download reports.

Calculator

Select the measurement system used on your drawings.
Standard estimates assume ~1.125 blocks per ft².
Enter feet (Imperial) or meters (Metric).
Use the full masonry height, excluding cap details.
Subtract total openings area from the wall area.
Typical joint is 3/8 in. Thicker joints increase mortar.
Used for a small thickness adjustment factor.
Cutting, breakage, and spares.
Spillage and tooling losses.
Defaults by block size Adjustable
Defaults are practical averages for planning.
Only used when custom option is selected.
Always confirm yield on the bag label.
Used only for custom yield.
Typical range: 4–5 quarts.
Include material costs
Optional budgeting using your local prices.
Clear results

Example data table

Scenario Wall (L×H) Openings Block type Waste Approx. blocks Approx. mortar
Garage wall 20 ft × 8 ft 16 ft² 8×8×16 5% blocks / 10% mortar ≈ 162 ≈ 2.9 ft³
Boundary wall 45 ft × 6 ft 0 ft² 6×8×16 7% blocks / 12% mortar ≈ 326 ≈ 6.0 ft³
Small partition 10 ft × 8 ft 21 ft² 4×8×16 5% blocks / 10% mortar ≈ 70 ≈ 1.1 ft³
Examples are illustrative. Your output will update using your selected settings.

Formula used

  • Net wall area: Area = (Length × Height) − Openings
  • Block count: Blocks = Area(ft²) × Blocks/ft² × (1 + Block waste)
  • Mortar volume: Mortar(ft³) = Blocks × Mortar/block × Joint factor × Thickness factor × (1 + Mortar waste)
  • Bags: Bags = ceil( Mortar(ft³) ÷ Bag yield(ft³/bag) )
  • Water: Water(quarts) = Bags × Water per bag
Joint factor scales mortar around a 3/8-inch baseline. Thickness factor is a light adjustment for thicker units and should be treated as an estimate.

How to use this calculator

  1. Choose your unit system, then select the CMU block type.
  2. Enter wall length and height, then subtract openings area.
  3. Set joint thickness and waste factors for your site conditions.
  4. Confirm bag yield and water per bag from your product label.
  5. Optionally add local prices to estimate material costs.
  6. Click Calculate to view results above the form.
  7. Use the CSV or PDF buttons to share results with your team.

Notes for better accuracy

  • Mortar yield varies by brand, moisture, and mixing method.
  • Tooling, buttering technique, and lift height affect waste.
  • Complex walls with corners and pilasters often need extra mortar.
  • For engineered work, confirm quantities with project specifications.

Professional guide to CMU mortar estimating

1) Why mortar quantity matters on site

Mortar is a small line item compared with masonry labor, yet shortages can stop a crew instantly. Over-ordering increases handling, cleanup, and disposal. A consistent estimating method supports scheduling, reduces emergency runs, and improves bid accuracy across repeatable wall types. In addition, predictable quantities help align deliveries with lift plans and reduce on-site stockpiles that can get damaged by weather.

2) Understanding the baseline block coverage

A standard 16-inch CMU length with 3/8-inch joints covers about 0.89 ft² per unit, which is why planning commonly uses roughly 1.125 blocks per ft². This calculator applies that baseline, then scales quantities for your net wall area and waste settings.

3) Net wall area and openings control the outcome

Accurate dimensions matter more than fine-tuning decimals. Measure overall wall length and height, then subtract door and window openings as a combined area. Even a single 3×7 ft door is 21 ft², often removing about 24 blocks plus their associated mortar.

4) Joint thickness influences mortar consumption

Joint thickness changes the volume of bed and head joints. Moving from 3/8-inch to 1/2-inch joints increases the joint factor by about 33%. If your team uses heavy bedding for alignment or rough units, plan for thicker joints and a higher mortar allowance.

5) Waste factors reflect real field conditions

Waste varies by lift height, site access, mixing location, and tooling. Typical planning ranges are 3–7% for blocks and 8–15% for mortar. Tight urban sites, long pump lines, or frequent starts and stops usually push mortar waste higher.

6) Bag yield, water demand, and mix consistency

Mortar bag yield depends on product type, sand content, and water added. Many 80 lb bags produce around 0.67 ft³ of mortar, while 60 lb bags are commonly near 0.45 ft³. Water per bag often falls near 4–5 quarts, but always confirm your label.

7) Budgeting: converting quantities into costs

Once mortar volume and bags are known, cost estimating becomes straightforward: bags multiplied by your delivered bag price. Add block unit cost for a quick material subtotal. For higher fidelity, consider taxes, delivery, pallets, and small tools, then compare against historical job data.

8) Practical checks before ordering

Review wall complexity: corners, returns, pilasters, bond beams, and lintels typically increase mortar use. Confirm whether units are standard, lightweight, or irregular, and whether grout and reinforcement are separate items. After calculating, round up to packaging and delivery constraints to avoid mid-day shortages. For best results, compare the estimate against a short takeoff on one representative wall bay and calibrate your settings for future phases.

FAQs

1) Is the block count accurate for all CMU sizes?

The calculator uses a standard planning rate of about 1.125 blocks per ft² for 16-inch-long units with typical joints. Specialty units, split-face, or nonstandard lengths can change coverage. Adjust waste or verify with layout drawings.

2) Why does joint thickness change mortar so much?

Mortar fills bed and head joints. Increasing thickness increases joint cross-section, so total volume rises quickly over many units. If joints are consistently thicker for leveling, use the measured thickness rather than a typical default.

3) What mortar-per-block value should I choose?

Use the default for quick planning. If you have job records or a spec-driven method, switch to a custom mortar-per-block value. That approach is useful when your crew technique, joint tooling, or unit absorption differs from typical conditions.

4) How do I estimate water more accurately?

Water depends on sand moisture, ambient heat, and desired workability. Start with the bag’s recommended range, then track actual usage for a few batches. Use those field averages for future estimates, especially on large repetitive walls.

5) Does this include grout for reinforced cells?

No. Grout is a separate material with different yield and placement methods. Use a dedicated grout volume calculator for reinforced cells, bond beams, and pilasters, and keep mortar and grout line items separated for clearer purchasing and control.

6) What waste percentages are typical?

Many projects use 5% block waste and 10% mortar waste as a starting point. Increase mortar waste for difficult access, frequent interruptions, or higher lifts. Reduce waste only when historical data supports consistently efficient production.

7) Why don’t my bags match the calculated number exactly?

Bag yield is an average and varies by brand, mixing time, and water content. The calculator rounds bags up to avoid shortages. If your supplier delivers by pallet, round to pallet quantities after confirming project schedule and storage space.