Plan grader rentals with transparent cost breakdowns. Factor transport, fuel, damage waiver, taxes, and discounts. Get printable summaries and exportable files quickly.
These example values show a typical short grading scope with surcharges and fees.
| Scenario | Mode | Units | Hourly | Fuel % | Tax % | Mobilization | Estimated Total |
|---|---|---|---|---|---|---|---|
| Subdivision rough grade | Daily | 3 | 165 | 6 | 8 | 250 | 4,261 |
| Road shoulder shaping | Hourly | 40 | 155 | 5 | 7 | 300 | 6,958 |
| Site drainage fine grade | Weekly | 1 | 175 | 8 | 9 | 200 | 6,591 |
The calculator builds a detailed estimate from base rental, time adjustments, fees, and percentage add-ons.
A motor grader rental quote commonly covers the machine, standard wear allowances, and a defined billing clock such as hourly, daily, weekly, or monthly. Some providers include an operator, while others rent “bare” equipment. Mobilization, transport, and insurance may be separate line items. This calculator mirrors that structure so you can compare offers on equal terms and avoid missing costs during procurement.
Hourly billing is useful for small punch lists, spot grading, and short road maintenance tasks. Daily and weekly rates fit predictable schedules such as subdivision grading, shoulder shaping, and drainage swales. Monthly pricing can reduce cost on longer programs, but you still need an operating schedule to estimate effective hourly cost. Use the mode that matches your vendor quote, then keep other rates filled to test alternatives.
Project productivity depends on material type, moisture, haul distance, and required finish tolerances. Fine grading and trim work usually lowers output compared to rough grading. In the calculator, base hours are derived from your hours-per-day and days-per-week assumptions, plus any overtime hours. The effective hourly rate helps you translate a “period rate” into a comparable hourly figure for budgeting and schedule tradeoffs.
Standby occurs when the machine is on site but cannot work due to inspections, rain, utility conflicts, or waiting on dump trucks. Many contracts bill standby at a reduced percentage of the hourly rate. Enter standby hours and a standby percentage to capture these realistic delays. Even a few standby hours per shift can materially change the final total on constrained sites.
Overtime is common for traffic control windows, night work, and accelerated schedules. The calculator applies an overtime multiplier to overtime hours, letting you model premium shifts. If you rent weekly or monthly, overtime can still drive total cost if your agreement charges OT separately or if operator premiums apply. Document OT assumptions clearly when you export CSV or PDF for stakeholders.
Fuel surcharges are often applied as a percentage of base rental cost, responding to fuel market variability. Damage waiver percentages may apply to rental hours as a risk transfer mechanism. This tool applies fuel surcharge to the base rental and applies damage waiver to base, standby, and overtime components. These are common structures, but you can adjust the percentages to match your contract language.
Mobilization and transport fees can dominate short rentals, especially for remote sites. Insurance, attachments, and environmental fees may also apply depending on jurisdiction and equipment configuration. Enter these as fixed amounts so the estimate reflects real purchase order values, not just “rate × time.” For bid checks, compare totals with and without these fees to understand sensitivity.
After you calculate, export the summary to CSV for cost tracking or to PDF for approvals. The CSV format works well for comparing multiple vendors, documenting assumptions, and building a rental register across projects. The PDF output provides a clean snapshot for supervisors, clients, or accounts payable. Consistent documentation reduces disputes and helps teams align on billing mode, standby treatment, and tax handling.
Use hourly for short, uncertain tasks and daily for full shifts. If you expect most of a day’s utilization, daily often reduces cost volatility and simplifies approvals.
Review past projects and identify typical delays from inspections, weather, or logistics. Start with 5–15% of planned working hours, then refine as constraints become clearer.
Standby is frequently billed at 25–75% of the hourly rate. Use the percentage specified in your contract or vendor quote, since practices vary by market.
Apply it when your agreement charges premium time for extended shifts, night work, or weekends. If OT is bundled into a period rate, keep overtime hours at zero.
Many providers tie fuel surcharge to the core rental charge for simplicity. If your vendor applies it differently, adjust the percentage or incorporate it into fees.
If the operator is included in the quoted rental rate, select “Yes.” If you must supply or pay separately, select “No” and enter the operator daily rate and days.
Use the same billing mode and assumptions for all bids. Enter each vendor’s fees, surcharges, waiver, and tax treatment, then compare grand totals and effective hourly rates.
Accurate inputs produce reliable estimates for confident project scheduling.